On the operational front, NTPC's gross power generation for the quarter ended September 2021 was 74.811 billion units compared to 67.673 billion units (BU) in quarter ended September 2020. The company's total installed capacity increased to 66,900 MW as on 30 September 2021 as against 62,910 MW as on 30 September 2020. Domestic coal supply for its plants in the September quarter stood at 43.39 million tonnes, up from 38.21 million tonnes in the same period a year ago. Coal production (from captive mines) in the September 2021 quarter stood at 2.79 million metric tonnes (MMT), up from 0.77 MMT in the same period a year ago. Coal imports of the firm...