Tivoli Construction Ltd. Additional Surveillance Measure (ASM) and Graded Surveillance Measure (GSM) as of Mar 17, 2025

LATEST STATUS
GSM - BSE, Stage 0
History
Exchange Long/Short Term Stage Entry date Exit date
BSE GSM Stage 0 20 Dec 2019 Active
BSE GSM Stage 0 06 Jun 2019 24 Jun 2019