ISGEC Heavy Engineering Ltd. Additional Surveillance Measure (ASM) and Graded Surveillance Measure (GSM) as of Sep 12, 2026

LATEST STATUS
Not active in ASM or GSM
History
Exchange Long/Short Term Stage Entry date Exit date
BSE Long Term ASM Stage I 15 Sep 2021 17 Dec 2021
BSE Short Term ASM Stage I 05 Feb 2021 15 Feb 2021
BSE Short Term ASM Stage I 17 Sep 2019 25 Sep 2019