Omnitech Engineering Ltd. Additional Surveillance Measure (ASM) and Graded Surveillance Measure (GSM) as of May 10, 2026

LATEST STATUS
Long Term ASM - BSE, Stage I
History
Exchange Long/Short Term Stage Entry date Exit date
BSE Long Term ASM Stage I 08 May 2026 Active
BSE Long Term ASM Stage II 27 Apr 2026 08 May 2026
BSE Long Term ASM Stage I 07 Apr 2026 27 Apr 2026
BSE Short Term ASM Stage I 02 Apr 2026 07 Apr 2026