Fujiyama Power Systems Ltd. Additional Surveillance Measure (ASM) and Graded Surveillance Measure (GSM) as of Jun 09, 2026

LATEST STATUS
Long Term ASM - BSE, Stage IV
History
Exchange Long/Short Term Stage Entry date Exit date
BSE Long Term ASM Stage IV 08 Jun 2026 Active
BSE Long Term ASM Stage I 05 Jun 2026 08 Jun 2026
BSE Short Term ASM Stage I 27 Apr 2026 20 May 2026