Fujiyama Power Systems Ltd. Additional Surveillance Measure (ASM) and Graded Surveillance Measure (GSM) as of Jul 19, 2026

LATEST STATUS
Long Term ASM - BSE, Stage I
History
Exchange Long/Short Term Stage Entry date Exit date
BSE Long Term ASM Stage I 17 Jul 2026 Active
BSE Long Term ASM Stage II 03 Jul 2026 17 Jul 2026
BSE Long Term ASM Stage III 19 Jun 2026 03 Jul 2026
BSE Long Term ASM Stage IV 08 Jun 2026 19 Jun 2026
BSE Long Term ASM Stage I 05 Jun 2026 08 Jun 2026
BSE Short Term ASM Stage I 27 Apr 2026 20 May 2026