NACDAC Infrastructure Ltd. Additional Surveillance Measure (ASM) and Graded Surveillance Measure (GSM) as of Sep 26, 2025

LATEST STATUS
Short Term ASM - BSE, Stage I
History
Exchange Long/Short Term Stage Entry date Exit date
BSE Short Term ASM Stage I 24 Sep 2025 Active
BSE Short Term ASM Stage I 09 Jan 2025 17 Jan 2025