Garuda Construction and Engineering Ltd. Additional Surveillance Measure (ASM) and Graded Surveillance Measure (GSM) as of Jul 25, 2025

LATEST STATUS
Short Term ASM - BSE, Stage I
History
Exchange Long/Short Term Stage Entry date Exit date
BSE Short Term ASM Stage I 21 Jul 2025 Active
BSE Short Term ASM Stage I 08 Jan 2025 30 Jan 2025