Misquita Engineering Ltd. Additional Surveillance Measure (ASM) and Graded Surveillance Measure (GSM) as of Mar 28, 2025

LATEST STATUS
Long Term ASM - BSE, Stage I
History
Exchange Long/Short Term Stage Entry date Exit date
BSE Long Term ASM Stage I 21 Mar 2025 Active
BSE Long Term ASM Stage I 29 Jul 2024 09 Aug 2024
BSE Long Term ASM Stage I 06 Mar 2024 07 Jun 2024
BSE Long Term ASM Stage I 19 Dec 2023 29 Dec 2023