TD Power Systems Ltd. Additional Surveillance Measure (ASM) and Graded Surveillance Measure (GSM) as of May 15, 2026

LATEST STATUS
Long Term ASM - BSE, Stage I
History
Exchange Long/Short Term Stage Entry date Exit date
BSE Long Term ASM Stage I 08 May 2026 Active
BSE Short Term ASM Stage I 04 Nov 2025 13 Nov 2025
BSE Long Term ASM Stage I 06 Sep 2023 08 Dec 2023
BSE Short Term ASM Stage I 17 May 2022 25 May 2022
BSE Long Term ASM Stage I 06 Sep 2021 22 Apr 2022
BSE Short Term ASM Stage I 17 Aug 2021 26 Aug 2021
BSE Short Term ASM Stage I 12 May 2021 04 Jun 2021
BSE Short Term ASM Stage I 26 Mar 2020 07 Apr 2020
BSE Short Term ASM Stage I 11 Feb 2020 19 Feb 2020