Kolte-Patil Developers Ltd. Additional Surveillance Measure (ASM) and Graded Surveillance Measure (GSM) as of May 03, 2025

LATEST STATUS
Not active in ASM or GSM
History
Exchange Long/Short Term Stage Entry date Exit date
BSE Short Term ASM Stage I 20 Apr 2020 28 Apr 2020