HBL Engineering Ltd. Additional Surveillance Measure (ASM) and Graded Surveillance Measure (GSM) as of May 02, 2025

LATEST STATUS
Not active in ASM or GSM
History
Exchange Long/Short Term Stage Entry date Exit date
BSE Long Term ASM Stage I 07 Aug 2023 09 Aug 2024
BSE Short Term ASM Stage I 11 Oct 2022 19 Oct 2022
BSE Short Term ASM Stage I 26 Apr 2022 05 May 2022
BSE Long Term ASM Stage I 24 Feb 2021 30 Apr 2021
BSE Short Term ASM Stage I 30 Oct 2020 09 Nov 2020
BSE Short Term ASM Stage I 17 Sep 2019 18 Oct 2019